OperatingCanton, Mississippi
Amazon announced two Madison County campuses in January 2024 and broke ground in May 2024; Gray describes its construction of a $1.6 billion AWS data-center campus in Canton. Amazon reported in August 2025 that its Madison County project had a first section operational, without naming the campus. Entergy Mississippi agreed in March 2024 to serve the two data centers.
- Developer
- Amazon Web Services
- Scale
- Investment
- $10B announced in 2024 for Amazon's two Madison County campuses; Gray describes its Canton campus work as $1.6B
- Observed hiring
- 23 employer openings in this market
Operating + constructionHermiston, Oregon
The City of Hermiston reports that this Amazon Data Services campus broke ground in 2023 and received its first certificate of occupancy in July 2024, with 83 jobs reported for 2025. City permits on the same parcel name Gray as builder of the data-center shells and fit-outs and OEG for electrical wiring, and further buildings were permitted through 2026.
- Developer
- Amazon Web Services
- Scale
- 215,000 sq ft data-center shells
- Investment
- About $3.1B reported to the city through 2025 (not assessed value)
- Observed hiring
- 65 employer openings in this market
Under constructionHermiston, Oregon
The City of Hermiston reports that this Amazon Data Services campus broke ground in 2024 and had no certificate of occupancy by the end of 2025. City permits name Balfour Beatty for the first data-center shell (February 2025) and Dynalectric for its temporary electrical service; shell permits for further buildings followed into 2026.
- Developer
- Amazon Web Services
- Scale
- Four data-center shells
- Investment
- Observed hiring
- 65 employer openings in this market
Operating + constructionNew Carlisle, Indiana
Amazon announced its St. Joseph County campus in April 2024 and held a ceremonial groundbreaking that September. Indiana's environmental agency issued an air permit for the first site on Larrison Boulevard in January 2025, and Amazon reported in October 2025 that the county's data centers are part of its operating Project Rainier cluster. No primary source names the campus's builders.
- Developer
- Amazon Web Services
- Scale
- Investment
- $11B announced in 2024 for data centers in St. Joseph County
- Observed hiring
- 20 employer openings in this market
ApprovedWest of Boardman, Oregon
Morrow County's planning commission approved this Amazon Data Services campus west of Boardman by a 5-2 vote on March 31, 2026, according to its draft minutes. The plan includes four data-center buildings, a water building and an on-site substation that Umatilla Electric Cooperative would own and operate. Construction is not confirmed.
- Developer
- Amazon Web Services
- Scale
- Four buildings, about 816,000 sq ft
- Investment
- Observed hiring
- 65 employer openings in this market
Under constructionConesville, Ohio
Aligned announced a 197-acre campus beside the former AEP Conesville power plant in July 2025, with a customer signed for the first building, and has published groundbreaking highlights. Initial capacity in mid-2026 is an Aligned target that no source yet confirms. The Coshocton County Port Authority secured state funding for the industrial park's water, sewer and roads.
- Developer
- Aligned Data Centers
- Scale
- At least three buildings planned
- Investment
- Multi-billion-dollar phased investment (Aligned); over $2 billion (state representative)
- Observed hiring
- 8 employer openings in this market
OperatingWest Jordan, Utah
Aligned operates three West Jordan buildings: SLC-02 was announced complete in March 2021 and SLC-03 in October 2024. No contractor or design firm is named for any of them in Aligned's releases. A separate SLC-04 site in West Valley City is not part of this record.
- Developer
- Aligned Data Centers
- Scale
- Three buildings, 34–80 MW each
- Investment
- Observed hiring
- 3 employer openings in this market
In developmentNear Castroville, Medina County, Texas
CyrusOne is developing a multi-phase campus west of San Antonio on US-90, under a Medina County tax-abatement agreement effective November 3, 2025. Its first building, SAT14A, was registered with the state in July 2026 as a 460,000-square-foot, one-story building designed by Corgan, with an estimated completion of June 1, 2027.
- Developer
- CyrusOne
- Scale
- Investment
- $4B to $6B expected across multiple phases (CyrusOne)
- Observed hiring
- 7 employer openings in this market
OperatingSan Antonio, Texas
CyrusOne operates SAT5 and SAT6 at the Texas Research Park. Rogers-O'Brien built SAT V's third phase, TDIndustries installed its mechanical systems (completed in 2021) and Corgan designed the building. Later SAT VI building and data-hall fit-outs were filed with the state; their estimated completion dates have passed without confirmation.
- Developer
- CyrusOne / Rogers-O'Brien Construction / TDIndustries / Corgan
- Scale
- 33 MW IT capacity
- Investment
- Observed hiring
- 7 employer openings in this market
Operating + expansionEagle Mountain, Utah
Meta reported its Eagle Mountain data center serving traffic on July 14, 2021, and announced a further expansion on September 14, 2026 without a completion date. Rocky Mountain Power is working with Meta on new solar supply. A builder for the expansion is not named in Meta's announcements.
- Developer
- Meta
- Scale
- Investment
- More than $3B in Utah including the 2026 expansion (Meta)
- Observed hiring
- Project activity only
OperatingGallatin, Tennessee
Meta broke ground in Gallatin in August 2020, and DPR's project team topped out the first phase, two buildings of nearly one million square feet, by January 2022. Meta reported the campus serving traffic on November 14, 2024. Full build-out is a Meta target; current construction is not confirmed by a primary source.
- Developer
- Meta
- Scale
- About 982,000 sq ft
- Investment
- $800M announced in 2020; more than $1.5B in Tennessee once fully built out (Meta target)
- Observed hiring
- Project activity only
Under constructionEagle Mountain, Utah
QTS is building a five-building first phase on about 193 acres in Eagle Mountain. Construction restarted in 2025 after a delay for energy infrastructure, and QTS and Layton Construction marked the topping-out of the third building on April 17, 2026. QTS targets three buildings first and the other two over the following years.
- Developer
- QTS Data Centers
- Scale
- Five-building first phase
- Investment
- $6B for the first phase (QTS)
- Observed hiring
- 6 employer openings in this market
Under constructionYork County, South Carolina
QTS is building its first South Carolina campus in York County. Gilbane, the builder, reported the steel topping-out of the first phase-one building on June 30, 2026; QTS says no building is complete or operating yet. Phase one is four buildings, and phase two is planned to start in early 2027.
- Developer
- QTS Data Centers
- Scale
- Nine buildings planned
- Investment
- $8B planned for the approved campus (QTS); $1B at the 2023 announcement
- Observed hiring
- 8 employer openings in this market
In developmentSan Antonio, Texas
Texas state filings describe a Vantage campus at 5207 Rogers Road: TX22, a new two-story data center designed by Corgan, was registered with an estimated start in October 2025 and completion by June 15, 2027. Construction progress is not confirmed by a primary source.
- Developer
- Vantage Data Centers
- Scale
- Investment
- Observed hiring
- 2 employer openings in this market
Operating + constructionSan Antonio, Texas
Texas state filings by Vantage describe its TX1 campus on Omicron Drive: TX11, a two-story 32 MW building designed by Sheehan Nagle Hartray Architects, shows its state inspection complete, and TX12, a two-story building designed by Jacobs, was filed with an estimated completion of August 31, 2027. Vantage has not published its own announcement for this campus.
- Developer
- Vantage Data Centers
- Scale
- 32 MW TX11; up to 96 MW TX12
- Investment
- Observed hiring
- 2 employer openings in this market
Under constructionShippingport, Pennsylvania
Aligned has broken ground on a three-facility campus in Shippingport, Pennsylvania. The development plans dedicated onsite power; the company estimates 3,000 construction jobs and 640 ongoing campus roles, not current vacancies.
- Developer
- Aligned Data Centers
- Scale
- 2 GW planned campus
- Investment
- Observed hiring
- Project activity only
Under constructionDenver, Colorado
DPR documents core-and-shell construction and an 18 MW initial fit-out. CoreSite reports generator testing and commissioning for June 2026. Its community page targets June operations while its market page says end-2026; these conflicting targets do not confirm an opening.
- Developer
- CoreSite
- Scale
- 18 MW initial phase
- Investment
- Observed hiring
- Project activity only
Under constructionAnkeny, Iowa
Edged's Ankeny data center topped out in August 2025. Its announced service target is the end of 2026; this profile does not treat that future target as delivered capacity.
- Developer
- Edged US
- Scale
- 13 MW planned critical IT capacity
- Investment
- Observed hiring
- Project activity only
AnnouncedIrving, Texas
Edged announced a second Irving facility in January 2026 after city approval. Its Q2 2026 groundbreaking date remains an unconfirmed target. The first facility opened in January 2025; that opening does not apply to the second building.
- Developer
- Edged US
- Scale
- 24 MW planned critical capacity
- Investment
- Observed hiring
- Project activity only
OperatingFort Worth, Texas
DPR documents phased construction beginning in 2015, first operations in 2017 and campus completion in 2023. This is an operating-campus delivery history, not a newly awarded construction package.
- Developer
- Meta
- Scale
- Five-building campus in DPR delivery account
- Investment
- Observed hiring
- Project activity only
OperatingSandston, Virginia
Meta reported Henrico serving traffic in August 2020. DPR documents the multi-phase five-building campus in White Oak Technology Park. This operating history does not establish a new construction award or completion of every later phase.
- Developer
- Meta
- Scale
- Five-building campus described by DPR
- Investment
- Observed hiring
- Project activity only
AnnouncedRosemount, Minnesota
Meta announced its Rosemount campus in March 2024 and directed construction inquiries to Mortenson. The announcement does not establish a current completion date or an operational handover; its projected workforce is not a count of open jobs.
- Developer
- Meta
- Scale
- 715,000-square-foot announced campus
- Investment
- Observed hiring
- 2 employer openings in this market
Under constructionCedar Rapids, Iowa
QTS is building a 612-acre campus planned for up to seven data center buildings in the Big Cedar Industrial Center.
- Developer
- QTS Data Centers
- Scale
- Investment
- $10B planned investment
- Observed hiring
- 12 employer openings in this market
OperatingHillsboro, Oregon
A 25-acre Portland-area campus supporting large-scale deployments, with redundant feeds and an expandable adjacent substation. The profile describes an operating site rather than a new groundbreaking.
- Developer
- QTS Data Centers
- Scale
- 20 MW+ critical power capacity
- Investment
- Observed hiring
- 2 employer openings in this market
Phased developmentNew Albany, Ohio
A 70-acre campus planned for three 64 MW buildings. The developer's published schedule describes phased deliveries through 2028; individual handovers require subsequent confirmation.
- Developer
- Vantage Data Centers
- Scale
- 192 MW planned critical IT load
- Investment
- Observed hiring
- 1 employer openings in this market
In developmentSanta Clara, California
A four-story data center planned on roughly eight acres near Vantage's existing Santa Clara campuses, with more than 486,000 square feet of space.
- Developer
- Vantage Data Centers
- Scale
- 64 MW planned critical IT load
- Investment
- Observed hiring
- 4 employer openings in this market
Site preparationAbilene, Texas
A two-building AI factory campus with dedicated onsite generation, under development adjacent to Crusoe's existing Abilene infrastructure.
- Developer
- Crusoe
- Scale
- 900 MW
- Investment
- Observed hiring
- 3 employer openings in this market
OperatingMesa, Arizona
Meta reported that its Mesa data center began serving traffic in January 2025. DPR describes a five-building campus and identifies its design partners. The operating announcement does not confirm completion of every building or a new construction award.
- Developer
- Meta
- Scale
- Five-building campus described by DPR
- Investment
- Observed hiring
- 5 employer openings in this market
Operating + expansionAbilene, Texas
The first phase is operating while the multi-building campus continues to expand for high-density AI workloads.
- Developer
- Crusoe / Lancium
- Scale
- 1.2 GW planned
- Investment
- Eight-building campus
- Observed hiring
- 3 employer openings in this market
Campus developmentAshburn, Virginia
Vantage's third Northern Virginia campus is designed for seven buildings on 134 acres, with about 2.3 million square feet of space.
- Developer
- Vantage Data Centers
- Scale
- 288 MW planned critical IT load
- Investment
- Observed hiring
- 3 employer openings in this market
Campus developmentGoodyear, Arizona
A 50-acre, five-building campus designed for more than one million square feet of data-center space. The published capacity describes the full campus development.
- Developer
- Vantage Data Centers
- Scale
- 176 MW planned critical IT load
- Investment
- Observed hiring
- Project activity only
ConstructionRichland Parish, Louisiana
Turner's July 2026 update describes an expanded Richland Parish campus approaching ten million square feet and 5 GW of IT capacity. The contractor projects about 7,500 workers at peak construction; these are forecast project workers, not current advertised openings.
- Developer
- Meta
- Scale
- 5 GW planned IT capacity
- Investment
- More than $50B expanded project investment
- Observed hiring
- 3 employer openings in this market
Operating + expansionGreater Memphis, Tennessee / Mississippi
An operating AI supercomputer campus with continued compute and power-infrastructure expansion across the Greater Memphis area.
- Developer
- SpaceXAI / Memphis Light, Gas and Water / Tennessee Valley Authority
- Scale
- Roadmap toward 1M GPUs
- Investment
- Permanent 1.2 GW power build underway
- Observed hiring
- Project activity only
Under constructionSterling, Virginia
Two fully leased hyperscale facilities are being developed across 685,000 square feet. Initial occupancy is scheduled separately for AS01 and AS02; the financing covers both buildings.
- Developer
- EdgeCore Digital Infrastructure
- Scale
- 114 MW combined critical load
- Investment
- $1.5B construction financing
- Observed hiring
- 28 employer openings in this market
Under constructionWest Memphis, Arkansas
Google is constructing its first Arkansas data center campus, including offices and a substation, in West Memphis. The statewide investment also covers other infrastructure and programs, so it is not presented as a site-only construction budget. A campus handover date and trade awards remain unconfirmed.
- Developer
- Google
- Scale
- More than 1,000-acre planned campus
- Investment
- Part of Google's $4B Arkansas investment through 2027
- Observed hiring
- 3 employer openings in this market
Under constructionLebanon, Indiana
Meta's approximately four-million-square-foot campus has broken ground in Lebanon. Turner and Mortenson identify construction partnerships and an expected peak workforce of about 4,000; this is a project forecast, not a count of open jobs.
- Developer
- Meta
- Scale
- 1 GW planned campus
- Investment
- $10B announced investment
- Observed hiring
- 11 employer openings in this market
Under constructionTulsa, Oklahoma
Meta broke ground on its first Oklahoma data center in April 2026 with Fortis Construction as general contractor. The campus includes local infrastructure improvements and is expected to employ more than 1,000 construction workers at peak.
- Developer
- Meta
- Scale
- More than 2 million square feet planned
- Investment
- More than $1B announced campus investment
- Observed hiring
- Project activity only
Vertical constructionClay, New York
Micron reported its first concrete pour in July 2026, following January groundbreaking. Bechtel is the first fab's EPC partner, Jacobs leads architectural and engineering design, and Gilbane handles preconstruction and site infrastructure. The company-wide investment plan is not a site-level budget.
- Developer
- Micron Technology
- Scale
- First fab within a planned four-fab campus
- Investment
- Observed hiring
- 5 employer openings in this market
Under constructionIndependence, Missouri
Nebius broke ground on a roughly 400-acre campus in May 2026. March's Chapter 100 incentive approval and the subsequent groundbreaking are separate milestones; the incentive decision is not a building permit.
- Developer
- Nebius
- Scale
- Up to 1.2 GW planned campus capacity
- Investment
- Observed hiring
- 2 employer openings in this market
Operating + expansionPhoenix, Arizona
The first fab entered volume production in late 2024. TSMC reports ongoing development of additional logic fabs and advanced packaging, including initial construction on a fourth fab and first packaging fab in early 2026.
- Developer
- TSMC
- Scale
- Multi-fab manufacturing and advanced packaging campus
- Investment
- Observed hiring
- 52 employer openings in this market
Under constructionShackelford County, Texas
A 1,200-acre AI campus planned for ten buildings and 3.7 million square feet. The developer targets first delivery in the second half of 2026 and specifies liquid cooling for high-density GPU workloads.
- Developer
- Vantage Data Centers
- Scale
- 1.4 GW planned critical IT load
- Investment
- More than $25B announced campus investment
- Observed hiring
- 13 employer openings in this market
Under constructionAbernathy / Hale County, Texas
Aligned's six-facility campus outside Abernathy is planned across 313 acres. The first building, LBB-01, targets service in Q1 2027; the full campus is a multi-year development.
- Developer
- Aligned Data Centers
- Scale
- 540 MW planned campus
- Investment
- $5B expected regional investment
- Observed hiring
- 2 employer openings in this market
Under constructionBoyce / Rapides Parish, Louisiana
Applied Digital is developing two data center buildings in Central Louisiana. Initial operations are targeted for mid-2027; campus-wide capacity is not delivered capacity.
- Developer
- Applied Digital
- Scale
- 300 MW planned critical IT load
- Investment
- $3.6B announced campus investment
- Observed hiring
- Project activity only
Operating + constructionEllendale, North Dakota
Applied Digital delivered another 75 MW at its Ellendale AI campus in June 2026, with additional buildings still under construction. CoreWeave is the contracted customer. The adjacent legacy bitcoin-hosting capacity is separate from this AI campus rating.
- Developer
- Applied Digital
- Scale
- 400 MW contracted critical IT load; 175 MW live as reported July 2026
- Investment
- Observed hiring
- 1 employer openings in this market
Under constructionHarwood, North Dakota
Applied Digital's Harwood campus remains under construction in its July 2026 update. The financing is allocated to 200 MW of critical IT load; it is not an operating-capacity figure or a total campus construction budget. A named general contractor is not confirmed in this coverage.
- Developer
- Applied Digital
- Scale
- 200 MW financed critical IT load
- Investment
- $2.15B senior secured notes for development
- Observed hiring
- Project activity only
Under constructionColorado City, Texas
Cipher reported construction and fit-out progressing at Barber Lake in August 2026, including initial tenant access. Gross power capacity is not live critical IT load; remaining delivery is phased.
- Developer
- Cipher Mining
- Scale
- 300 MW gross campus power capacity
- Investment
- Observed hiring
- Project activity only
Operating + constructionWink, Texas
The Black Pearl campus combines existing operations and HPC construction. Cipher's August update reports initial HPC delivery alongside remaining mechanical, electrical and plumbing work and second-phase structural activity.
- Developer
- Cipher Mining
- Scale
- 300 MW gross campus power capacity
- Investment
- Observed hiring
- Project activity only
Site preparationAndrews County, Texas
Stingray is in site preparation for a contracted hyperscale development. Lease commencement targets are phased during April and May 2027; these contractual dates are not a claim of completed commissioning.
- Developer
- Cipher Mining
- Scale
- 70 MW planned critical IT load / 100 MW gross power
- Investment
- Observed hiring
- Project activity only
In developmentLouisa County, Virginia
EdgeCore's 697-acre campus is planned for phased development totaling more than 3.1 million square feet. The full-campus plan is not operating capacity, and named construction-package awards are not established in this coverage.
- Developer
- EdgeCore Digital Infrastructure
- Scale
- More than 1.1 GW planned critical IT load across six data centers
- Investment
- Observed hiring
- Project activity only
Under constructionAtlanta, Georgia
The third building at Edged's Atlanta campus topped out in April 2026, with operations targeted for early 2027. Construction, design, cooling and power partners are identified for this building rather than assumed across the entire campus.
- Developer
- Edged US
- Scale
- 42 MW planned critical IT capacity
- Investment
- Observed hiring
- 21 employer openings in this market
Under constructionAurora, Illinois
Edged's second Chicago-campus building topped out in June 2026 and targets Q2 2027 service. It is distinct from the first building that opened in 2025.
- Developer
- Edged US
- Scale
- 72 MW planned critical IT capacity
- Investment
- Observed hiring
- Project activity only
Under constructionAbernathy / Hale County, Texas
This campus is distinct from Aligned's Project Caprock in the same area. TeraWulf announced an agreement to sell its 50.1% joint-venture interest to Fluidstack; the August update had not reported the transaction closed.
- Developer
- TeraWulf / Fluidstack
- Scale
- 168 MW planned critical IT load
- Investment
- Observed hiring
- Project activity only
Under constructionGray and Roberts Counties, Texas
Google and Intersect Power broke ground on an integrated data center and energy development in June 2026. The energy developer's role does not establish a general-contractor or trade-package award.
- Developer
- Google / Intersect Power
- Scale
- Investment
- Observed hiring
- Project activity only
Under constructionWilbarger County, Texas
Google broke ground on its Wilbarger County data center in February 2026. AES is associated with the power infrastructure; corporate energy purchases are not attributed as campus IT capacity or construction spending.
- Developer
- Google
- Scale
- Investment
- Observed hiring
- Project activity only
Under constructionChildress, Texas
IREN's Microsoft AI-cloud deployment is planned across four Horizon phases during 2026. The service contract value is not a campus capital budget, and the existing site's power capacity is distinct from the contracted IT deployment.
- Developer
- IREN
- Scale
- 200 MW IT capacity for Microsoft within a 750 MW power campus
- Investment
- Observed hiring
- Project activity only
Under constructionSweetwater, Texas
Sweetwater combines 1,400 MW and 600 MW power-enabled development sites. Substation delivery is phased across 2026 and 2027. Power capacity is not commissioned IT load or currently advertised labor demand.
- Developer
- IREN
- Scale
- 2 GW planned power capacity across two sites
- Investment
- Observed hiring
- Project activity only
Under constructionBeaver Dam, Wisconsin
Meta is developing an AI-focused campus with Mortenson as general contractor and Alliant Energy coordinating power requirements. The city's fact sheet targets the initial data center for 2027. A possible second phase is not treated as an awarded construction package.
- Developer
- Meta
- Scale
- More than 700,000 square feet planned
- Investment
- $1B announced campus investment
- Observed hiring
- 1 employer openings in this market
Under constructionEl Paso, Texas
Construction is underway on Meta's El Paso campus, with initial capacity targeted for 2028 and a projected peak construction workforce of more than 4,000. Meta announced a BlackRock-backed development venture in July 2026, subject to closing.
- Developer
- Meta
- Scale
- 1 GW planned compute capacity
- Investment
- Approximately $14B proposed venture development cost
- Observed hiring
- 6 employer openings in this market
Construction + expansionMontgomery, Alabama
Meta expanded the original Montgomery campus plan with two additional buildings in September 2025. Hensel Phelps documents its original construction award and a mass-timber administrative facility. Its end-2026 completion target covers the original contract, not a confirmed handover of the expanded campus.
- Developer
- Meta
- Scale
- Nearly 1.3 million square feet planned
- Investment
- More than $1.5B expanded campus investment
- Observed hiring
- Project activity only
Under constructionBoise, Idaho
Micron is building two Idaho memory fabs alongside its existing R&D operations. Its July update targets initial output in mid-2027 for ID1 and late 2028 for ID2. Kiewit identifies construction-management work on the Boise expansion.
- Developer
- Micron Technology
- Scale
- Two planned leading-edge DRAM fabs
- Investment
- Observed hiring
- 38 employer openings in this market
Under constructionMaiden, North Carolina
Microsoft's May 2026 update describes continuing construction at Boyd Farms. Morgan Corp. was named for initial site preparation; that relationship is not an award for all subsequent building work.
- Developer
- Microsoft
- Scale
- Investment
- Observed hiring
- Project activity only
Site preparationHeath, Ohio
Microsoft's July 2026 update identifies Ames Construction on site preparation. The anticipated end-of-2026 completion applies to site preparation, not delivery of an operating data center.
- Developer
- Microsoft
- Scale
- Investment
- Observed hiring
- Project activity only
Site preparationHebron, Ohio
Ames Construction is conducting site preparation for Microsoft's Hebron development. The July update targets completion of that preparation by the end of 2026; a vertical-construction delivery date is not specified.
- Developer
- Microsoft
- Scale
- Investment
- Observed hiring
- Project activity only
Under constructionHickory / Newton, North Carolina
The May 2026 update describes utilities and foundations, with Clayco leading the current construction phase. Ames handled earlier excavation. The announced late-June steel-work target is retained as a target, not a verified completed milestone.
- Developer
- Microsoft
- Scale
- Investment
- Observed hiring
- Project activity only
Operating + constructionMount Pleasant, Wisconsin
Microsoft's first facility is operating. The adjacent second facility remains under construction, with foundations, structural steel and underground utilities underway and completion targeted for 2028. Separate early earthwork supports further development; it is not a third operating facility.
- Developer
- Microsoft
- Scale
- Investment
- Observed hiring
- Project activity only
Under constructionVineland, New Jersey
DataOne is developing and operating the campus for Nebius' GPU infrastructure, with Northeast Precast leading construction and Bloom Energy supplying fuel cells. The project targets operations in 2027. The January PILOT ordinance is a tax arrangement, not a building permit.
- Developer
- DataOne
- Scale
- Investment
- Observed hiring
- Project activity only
Operating campus / expansion capacityAtlanta, Georgia
A 99-acre campus with direct carrier fiber access and an expandable substation plan supporting staged campus development.
- Developer
- QTS Data Centers
- Scale
- 278 MW+ critical campus capacity
- Investment
- Observed hiring
- 9 employer openings in this market
Operating + expansion leasingChicago, Illinois
A 30-acre campus near downtown Chicago. QTS is marketing pre-leasing for its second building; this does not by itself establish a construction start or delivery date.
- Developer
- QTS Data Centers
- Scale
- Investment
- Observed hiring
- Project activity only
Operating campus / expansion capacityAurora, Colorado
QTS's 65-acre Aurora campus includes owned land for further growth. Its published 160 MW-plus figure is planned campus capacity, not a measure of current construction jobs.
- Developer
- QTS Data Centers
- Scale
- 160 MW+ planned critical power
- Investment
- Observed hiring
- 1 employer openings in this market
Operating campus / expansion capacityFort Worth, Texas
A 52-acre campus with twelve adjacent acres identified for future expansion. QTS distinguishes critical capacity from the larger gross campus power potential.
- Developer
- QTS Data Centers
- Scale
- 70 MW+ critical; 200 MW gross planned potential
- Investment
- Observed hiring
- 12 employer openings in this market
Operating campus / expansion capacityIrving, Texas
A 56-acre master-planned campus with six facilities and campus fiber pathways connecting current and future buildings.
- Developer
- QTS Data Centers
- Scale
- 165 MW+ critical campus capacity
- Investment
- Observed hiring
- 12 employer openings in this market
Operating campus / expansion capacitySandston, Virginia
A 207-acre campus with a six-facility master plan and 2.3 million square feet of current space. QTS identifies multiple building addresses within the same campus.
- Developer
- QTS Data Centers
- Scale
- 238 MW campus critical power
- Investment
- Observed hiring
- 1 employer openings in this market
Construction and manufacturing preparationTaylor, Texas
Samsung is developing a logic-chip manufacturing facility in Taylor alongside its established Austin operations. Samsung E&C America is the lead general contractor. The original Taylor investment plan covers buildings, property improvements, machinery and equipment.
- Developer
- Samsung Austin Semiconductor
- Scale
- Investment
- At least $17B original Taylor buildout plan
- Observed hiring
- Project activity only
Under constructionSaline Township, Michigan
Related Digital is developing a Saline Township campus for Oracle and OpenAI. Walbridge confirmed active construction in May 2026 under a project labor agreement covering more than 2,500 union tradespeople and apprentices; that figure is not a count of advertised vacancies.
- Developer
- Related Digital
- Scale
- Gigawatt-scale planned campus
- Investment
- $16B announced campus investment
- Observed hiring
- 14 employer openings in this market
Phased developmentHawesville / Hancock County, Kentucky
TeraWulf's phased campus has an Anthropic lease and an approved electric-service agreement. Initial delivery targets the second half of 2027, with full contracted delivery in early 2028. Lease revenue is not a construction budget.
- Developer
- TeraWulf
- Scale
- 401 MW contracted critical IT load; up to 482 MW electric service
- Investment
- Observed hiring
- Project activity only
Operating + constructionBarker / Somerset, New York
The operating HPC campus continues its phased expansion. CB4 targets delivery in the second half of 2026 and CB5 in early 2027. These are separate construction and operating capacity figures.
- Developer
- TeraWulf
- Scale
- 102 MW operating and 336 MW under construction, reported August 2026
- Investment
- Observed hiring
- Project activity only
Under constructionPort Washington, Wisconsin
A 672-acre AI campus planned for four buildings and 2.5 million square feet. Vantage's campus profile targets completion in 2028.
- Developer
- Vantage Data Centers
- Scale
- 902 MW planned critical IT load
- Investment
- Observed hiring
- 6 employer openings in this market
OperatingQuincy, Washington
An operating 68-acre campus with three data centers and approximately 775,000 square feet. This is an operations footprint, not a newly announced construction project.
- Developer
- Vantage Data Centers
- Scale
- 89 MW campus critical IT load
- Investment
- Observed hiring
- Project activity only
Phased developmentStorey County, Nevada
A 137-acre, four-building campus designed for air and liquid cooling. The campus profile identifies a second-quarter 2026 opening target for the first facility, not a confirmed handover.
- Developer
- Vantage Data Centers
- Scale
- 224 MW planned critical IT load
- Investment
- Observed hiring
- 3 employer openings in this market
In developmentCedar Rapids, Iowa
Google is developing a new Cedar Rapids data center campus while expanding Iowa's electrical-workforce pipeline to support the infrastructure buildout.
- Developer
- Google
- Scale
- Investment
- Part of Google's $7B two-year Iowa investment
- Observed hiring
- 5 employer openings in this market
Development + constructionSt. Francisville, Louisiana
A staged AI data-center campus with a defined construction, commissioning, and operations labor transition.
- Developer
- Hut 8
- Scale
- 330 MW commercialized; 1 GW potential
- Investment
- Up to $10B phase-one investment
- Observed hiring
- 1 employer openings in this market
Operating + expansionMuskogee, Oklahoma
Core Scientific is expanding its Muskogee campus using 440 MW of acquired grid-connected power, with the next approximately 82 MW targeted for customer delivery beginning in the second half of 2027.
- Developer
- Core Scientific
- Scale
- 1.5 GW gross target
- Investment
- $444M power acquisition
- Observed hiring
- 3 employer openings in this market
PlannedPecos County, Texas
A planned data center campus expected to use new onsite generation initially and transition to grid-connected service as interconnection becomes available.
- Developer
- Amazon Web Services
- Scale
- Investment
- Observed hiring
- Project activity only
Under constructionNueces County, Texas
A fully contracted AI data center campus under construction with two 352 MW leases and initial energization scheduled for the first quarter of 2027.
- Developer
- Hut 8
- Scale
- 704 MW contracted IT; 1 GW utility
- Investment
- $19.6B base-term campus value
- Observed hiring
- Project activity only
Construction startingChildress, Texas
A 270-acre AI data center campus developed by Crusoe and Lancium, with construction scheduled to begin in the third quarter of 2026.
- Developer
- Crusoe / Lancium
- Scale
- 1 GW
- Investment
- Observed hiring
- 5 employer openings in this market